Temporary road closure for night work on Isles Drive, North Boambee
As part of major construction, the project team is laying asphalt pavement on Isles Drive between Englands Road and Industrial Drive, North Boambee. To do this work we will temporarily close this area which means vehicles will need to take a detour. Isles Drive will be temporarily closed between Englands Road and Industrial Drive between 6pm and 6am. To ensure the safety of workers and motorists, there will be a temporary detour using the Pacific Highway and Isles Drive (north). Motorists should allow extra travel time, be patient and follow directions of traffic controllers.
Traffic Changes on the Pacific Highway, Boambee
As part of major construction, the project team is temporarily moving the Pacific Highway northbound traffic onto new lanes between Sawtell Interchange and Englands Road/Stadium Drive. The project team will make this change in traffic arrangements outside of approved construction hours before the end of May 2025. Motorists will be informed of the exact date via electronic message signs in this area.
Vegetation maintenance along the Pacific Highway Boambee - April 2025
As part of major construction, the Coffs Harbour bypass project is carrying out vegetation maintenance along the Pacific Highway between south of Sawtell Interchange and north of Englands Road/Stadium Drive, Boambee.
Out of hours work on the Pacific Highway, Boambee
As part of major construction, the project team are working outside of approved construction hours along the Pacific Highway between Sawtell Interchange and Englands Road/Stadium Drive, Boambee.
Pacific Highway and local road changes, Korora
As part of major construction, the project team is temporarily moving the Pacific Highway northbound traffic onto new lanes between Charlesworth Bay Road and Campbell Close, Koro
Pacific Highway and local road changes, Boambee
As part of major construction, the project team is making temporary and permanent traffic changes along the Pacific Highway and local roads north of the Sawtell Interchange and at the new England's Road Interchange.
Out of hours drainage work on the Pacific Highway, Korora
As part of major construction, the project is installing drainage outside of approved construction hours on the Pacific Highway just south of the Luke Bowen Footbridge, Koro
Controlled blasting between West Korora Road and Bruxner Park Road
As part of major construction, the Coffs Harbour bypass project will recommence drilling and controlled blasting between Bruxner Park Road and West Korora Road from March 2025.
Asphalt batch plant operations and noise wall installation in North Boambee Valley
The Coffs Harbour bypass has built a temporary asphalt batch plant on North Boambee Road. This plant will only provide asphalt for the project and will be removed after bypass construction is completed.
Noise wall installation on Coramba Road