Request accessible format of this publication.
Roof plumbing - Certificate III units of competency
Course code CPC32411
For eligibility to apply for roof plumbing work, the Certificate III in Plumbing CPC32411 requires completion of stream 5 - roofing.
You can print this page to check off each unit you have completed to ensure you meet the Certificate III qualification requirements for roof plumbing.
Stream 5 - roofing
You need to complete all 8 compulsory units and 4 elective units from the roofing stream.
Complete ALL compulsory units - roofing | ||
Compulsory unit code | Compulsory unit name | Unit completed |
CPCPCM2028A | Cut and join sheet metal | |
CPCPRF2012A | Select and install roof sheeting and wall cladding | |
CPCPRF2013A | Collect and store roof water | |
CPCPRF3011A | Receive roofing materials | |
CPCPRF3012A | Fabricate and install roof drainage components | |
CPCPRF3013A | Fabricate and install external flashings | |
CPCPRF3014A | Install roof components | |
CPCPRF3016A | Install composite roof systems | |
Complete 4 elective units - roofing | ||
Elective unit code | Elective unit name | Units completed |
CPCCCM2008A | Erect and dismantle restricted height scaffolding | |
CPCCCM3001A | Operate elevated work platforms | |
CPCCPB3015A | Install acoustic and thermal environmental protection systems | |
CPCCRI3001A | Operate personnel and materials hoists | |
CPCCST2005A | Carry out load slinging of off-site materials | |
CPCPCM2029A | Cut using oxy-LPG-acetylene equipment | |
CPCPRF2014A | Fabricate roof coverings for curved structures | |
CPCPRF3015A | Install roof coverings to curved roof structures | |
RIICCM210A | Install trench support | |
MEM05050B | Perform routine gas metal arc welding | |
MEM05049B | Perform routine gas tungsten arc welding | |
CPCCCM2010A | Work safely at heights |